Installation of membrane elements
ge water machine before the installation of membrane components, should ensure that the system has completed the cleaning work.
Membrane components in the system, to properly lubricate the O-ring and concentrated water ring, you can use silicone or 50% glycerol aqueous solution, prohibit the
Oil, grease, petrolatum or petroleum compounds.
When the membrane elements are loaded into the pressure vessel one by one, the gap is removed by the addition of the gasket at the end plate of the pressure vessel to prevent the pressure in the system
The membrane element is moved in the pressure vessel during start-up and shutdown, and the possibility of leakage at the outer connection of the membrane element can be reduced.